Shing-a-ling

Crews have been finalizing the rafter systems and the lower pitch section between the two peaks. The new roof was hipped into the old one, a portion of the metal roof was removed for this. There were old cedar shingles under the metal roof then thick wide horizontal boards perpendicular to the rafters. The cedar shingles were taken off and OSB was placed on the thicker material to secure the new rafters to.

The house as of today.




I'll try to get some more detailed framing pictures later this weekend. I was running low on daylight and wanted to get some areas of the construction site cleaned up.