Basement floor forms. A funky landing was needed to bridge the old and new basement.
The finished landing.
Basement crock area before the pour.
Crock area and back wall after the pour.
New lawn job from the cement trucks.
We made a temporary compromise on the siding and some of the electrical. We took off the the aerial lines going from the house out to the lights on the old windmill. The ceramic standoffs would have been a bit unsightly against the new siding job. Eventually we'll trench out to the windmill tower and restore power for the yard lights.
West wall siding started.
West wall siding nearly complete.
The main addition doors were put in.
Back double door.
Main entryway door.
I used the box blade to smooth out a neighbor's road where water run off had cut gullies through the middle.
We also got our PTO tiller functional. Half the drive-line shaft was missing so I built a new one to integrate with the existing slip clutch.