Wednesday, January 2, 2019

Road Reconditioning


The road we use for access to our 33 acres of farm land has always been a bit mucky. Since it's being used more for our hunting lease and the condition is deteriorating we decided the do a bit of work on it.

The neighbor has a pond that drains excess water under the road so we patched the existing culvert and installed an extra culvert.

Declan was eager to helped fill the bucket so he could help dump it.

First of two loads of 21AA gravel for top dressing.




Laying out the last of the 1-3 crushed concrete.




No comments:

Post a Comment